Streamlining Warehouse Operations: A Case Study on Leeshion's Rugged PDA LS-KP36 Implementation

Executive Summary

A leading logistics company faced inefficiencies in inventory management, order picking, and real-time data synchronization across its warehouse operations. To address these challenges, the company implemented Leeshion's Rugged PDA LS-KP36, a high-performance handheld device designed for demanding industrial environments. This case study explores how the LS-KP36 improved accuracy, productivity, and operational visibility, resulting in 30% faster order processing and a 25% reduction in errors.


1. Challenges in Warehouse Management

The company struggled with:

  • Manual data entry errors causing shipping delays.

  • Slow barcode scanning with outdated devices.

  • Poor connectivity in large warehouse spaces.

  • Device fragility, leading to frequent replacements.

To modernize operations, they needed a rugged, high-speed PDA with seamless integration into their warehouse management system (WMS).


2. Solution: Leeshion's Rugged PDA LS-KP36

The LS-KP36 was selected for its:
 Industrial-Grade Durability – IP67 waterproof, 1.5m drop-resistant.
 High-Speed Scanning – 1D/2D barcode & RFID support.
 4G/Wi-Fi/Bluetooth Connectivity – Ensures real-time data sync.
 Long Battery Life – 4000mAh battery for all-shift usage.
 Android OS & Custom App Support – Easy WMS integration.

Implementation Process

  • Pilot Testing: Deployed 50 units in high-traffic zones.

  • Full Rollout: Expanded to 300+ devices across warehouses.

  • Staff Training: Conducted hands-on sessions for seamless adoption.


3. Results: Efficiency & Cost Savings

After six months, the company achieved:

Operational Improvements

📌 30% Faster Order Fulfillment – Reduced scanning time with instant data capture.
📌 25% Fewer Errors – Eliminated manual entry mistakes.
📌 Real-Time Inventory Updates – Improved stock accuracy to 99.2%.

Financial & Productivity Gains

📌 20% Labor Cost Reduction – Fewer delays and reworks.
📌 ROI in 9 Months – Savings from reduced errors and downtime.


4. Conclusion & Future Plans

The LS-KP36 transformed warehouse operations with:
 Reliable performance in harsh conditions.
 Seamless WMS integration for real-time tracking.
 Long-term cost savings from reduced device failures.

Next Steps:

  • Expanding RFID integration for pallet tracking.

  • Testing AI-powered inventory forecasting with PDA-collected data.


Why Choose Leeshion’s LS-KP36?

 Built for warehouses – Rugged, fast, and future-proof.
 Customizable – Works with your existing WMS.
 Proven ROI – As demonstrated in this case study.

CTA: Ready to optimize your warehouse? [Contact Leeshion] for a tailored rugged PDA solution.

Back to blog

Leave a comment